Orcmid's Lair

c080801 Orcmid's Lair Construction Note
Site Repaving
2008-08-29 Announcement

orcmid>construction>
2008>08>

c080801c>
0.00 2022-05-06 16:35 -0700


1. Announcement Inserts

1.1 Area Undergoing Repaving

Orcmid's Lair> repaving> 2008-08-29 announcement>


Orcmid's Lair Is Being Repaved.

The Orcmid's Lair site is being repaved to correct problems resulting from movement to a new web server.   At the same time, the site is being adjusted to use the latest styles and formats that are applicable to this and other sites of the nfoCentrale.net family.

Check the Site Repaving Project pages for additional details on the approach to repaving and its tracking.  Contact the technical coordinator with questions and to report any defects that you notice.

 

The basic notice is used for notification in all locations where customization of material is needed before the repaving is complete.  This notice applies to the level at which it appears and all levels deeper than that.  It cannot be removed until the current level and all lower levels are complete.  If there is content as well as construction structure at or below a given level, this notice is not removed until the repaving of both are complete and so indicated.

1.2 Completed Construction Structure Repaving


This Construction Structure was successfully customized as part of the
2008-08-29 stage of Site Repaving.  Check those pages for additional details of the approach to customization. 
Contact the technical coordinator with questions and to report any defects that you notice.

This insertion amends/replaces the announcement insertion when the construction structures at the point of insertion and for all deeper levels have been repaved.

1.3 Completed Content Material Bootstrap


The Content Material here was successfully customized as part of the
2008-08-29 stage of Site Repaving.  Check those pages for additional details of the approach to repaving and customization. 
Contact the technical coordinator with questions and to report any defects that you notice.

This insertion amends/replaces the announcement insertion when the content material governed by a job jar, a Construction Structure page, or a Construction Zone has been repaved.  On a Construction Structure page, this applies to immediate content.

1.4 Conforms to Current Structure


This material conforms to the
2008-08-29 styles for Site Repaving.  Check those pages for additional details of the approach and the styles. 
Contact the technical coordinator with questions and to report any defects that you notice.

This insertion is used with new material that is created directly on the site is "born conformant" with regard to this repaving's requirements.

Because the pages having these notices can be located by checking for all hyperlinks to the include pages, it is easy to determine what areas need to be revisited and reviewed in a new wave of modifications, and to then track the percolation of changes to those materials.

2. Approach 

  1. The first priority is to have the construction structure of the site be current and properly connected. 

    • This is accomplished by performing a review starting with the foyer or "front porch," the root materials at http://orcmid.com/.  Work items and their completion will be reported as part of the front-porch Construction Zone.

    • After the front porch is adjusted, the construction structure of each subfolder is reviewed, extending recursively through all of the construction-structure elements only.    Additional items that happen to be noticed will be added to the work items of the applicable construction zone. 

    • The construction structure and the related construction zones can be located by navigating the construction structure provided at the front porch, once the repaving wave is begun there.

    • When the construction structure is reviewed and adjusted as necessary, a completion message will be inserted to avoid wondering which structures have and have not been reviewed.
        

  2. The second priority is to have enough Construction Material be consistent, reachable, and providing the proper templates. 

    • It is not necessary to rush customization of material that is used only by the web master, so long as the material that visitors see on main content pages is correct. 

    • Template materials will be correct, but the descriptive material for their use might not be updated until more-urgent content is provided.
         

  3. The third priority is to have a correct Readings Section Available for Use.  The readings/ section needs to be repaved for consistent use and continued reference by many visitors.  It is important to have the new style everywhere.
       

  4. The remaining sections will be repaved in the correct style and format for the site.  These will usually be simpler.  The blog folders have a great deal of construction structure to update, but very little content needs to be edited directly.  The viaggio and writings sections, and some others, require more extensive review and update.


Attribution:
Hamilton, Dennis E.
Site Repaving 2008-08-29 Announcement.   Orcmid's Lair Construction Materials Note  c080801c 0.00, August 29, 2008.  Available at <http://orcmid.com/construction/2008/08/c080801c.htm>.
Revision History:
0.00 2008-08-29-11:03 Create Initial Announcement Placeholder
This page is fully customized for the Orcmid's Lair 2008-08-29 Repaving Announcement and the related include-page material.

Construction Structure (Hard Hat Area)

You are navigating
Orcmid's Lair construction material.

created 2008-08-28-18:38 -0700 (pdt) by orcmid
$$Author: Orcmid $
$$Date: 22-05-06 16:35 $
$$Revision: 126 $